Maria runs the data collection behind our solar pages. She checks installer registrations against the electrical contractor register, records quoted system prices, and tracks changes to the grant schemes as they are published.
Published
Three things separate a solar company you can hold to a contract from one you cannot: a company registration you can look up, a named person who is registered to certify the electrical work, and a written quote that lists the panel model, the inverter model and who submits the connection application to the Electricity Authority of Cyprus. Showroom, brochure and headline price tell you nothing. Ask for those three, in writing, before you discuss money.
What can actually be verified
Most of what a salesperson tells you cannot be checked. Four things can.
The legal entity. Every limited company in Cyprus has an HE number on the Registrar of Companies. Ask which name goes on the contract and what its HE number is. Trading names and registered names differ more often than you would expect, and a warranty is only worth what the entity behind it is worth.
Professional registration. Design and certification of a grid-connected system sit with people who are registered to do that work — the Cyprus Scientific and Technical Chamber (ETEK) maintains the register for engineers. Ask for the name and registration of the person who signs, not the name of the company.
Whether they have done the connection before. You cannot audit a track record, but you can ask for the connection application reference and year from a past job in your district. A company that submits these routinely produces one in minutes. A company that has always subcontracted the step will not.
VAT and invoicing. A quote that is one number in a message has nothing behind it. An invoice from a registered entity, with the VAT treatment stated, is the minimum.
What cannot be verified: output promises, "hundreds of systems installed", awards, and photographs of roofs that may or may not be theirs. We list registered installers by district with the credentials we have checked against the body that issued them, and how long each company has been on the register. We do not publish ratings.
Registrations that matter
Four registrations touch a residential rooftop system in Cyprus, and they do different jobs.
Registrar of Companies
Confirms the entity exists and who stands behind it. Match the HE number on the quote to the name on the bank details before any deposit leaves your account.
ETEK
The engineer responsible for the design and for signing off the installation is registered here. On a system large enough to need a design calculation, this is the registration that carries the technical responsibility.
Electrical contractor registration
Someone has to connect the inverter to your consumer unit and certify that work. Ask who that person is and whether they are employed by the company or called in. If they are called in, ask who holds the certificate afterwards.
The Electricity Authority of Cyprus, as counterparty
Not a registration of the installer, but the relationship that decides whether your system can export at all. The application to connect and export-meter is submitted before commissioning and takes around 45 days in normal conditions. Where local network capacity is constrained, a load assessment may be required first — common on the dense tourist-area feeders around Germasogeia.
The grant adds one more constraint. The residential photovoltaic support scheme pays up to €1,500 and is applied for before installation begins, subject to system size limits and a means test. Any company that tells you to start now and apply afterwards is costing you the grant, and either does not know the scheme or is hoping you do not.
Questions to ask
Put these to every company and write the answers down. Where two quotes differ, the difference is usually hiding in one of them.
- Which entity contracts with me, and what is its HE number?
- Who submits the connection application, and when in the sequence? If the answer is "after installation", ask what happens if a load assessment comes back badly.
- Which panel model, how many, and at what rating each? "Tier 1 panels" is not a specification. A model number is.
- Which inverter, and string or optimised? This matters more in Cyprus than people expect, because so many roofs carry a water tank, an existing solar thermal cylinder or a stair enclosure that shades panels for part of the day.
- How are the roof penetrations made and sealed, and who warrants the waterproofing afterwards? Most Cypriot houses have a flat concrete roof with a membrane on it. Whoever drills through that membrane owns the consequences.
- What fixings? On the coast — Kato Paphos, the Limassol seafront, Oroklini — salt-laden air is the reason galvanised and marine-grade fixings are standard. A stainless specification on a coastal roof is not an upsell.
- How does the equipment get up there? On the hillside plots around Peyia, steep access roads limit crane and delivery vehicle size, and access is a real line item rather than a rounding error.
- Whose name is the monitoring account in? It should be yours, with the installer added. Otherwise you lose visibility of your own system the day you fall out with them.
- What are the payment stages? Deposit, delivery, commissioning, connection.
What a good quote looks like
A quote you can compare has a price per kWp in it, because that is the only unit that makes two different system sizes comparable.
At the ends of that range, a 5 kWp system is roughly €4,500 to €6,500 installed before any grant. A quote well below the bottom is not a bargain until you have found what is missing from it — usually access equipment, the connection application, or the electrical certification.
Beyond the price, a complete quote states:
- Panel model, quantity and rating; total system size in kWp.
- Inverter model and rating, and whether optimisers or micro-inverters are included.
- Mounting system and fixing specification, with the coastal grade named where it applies.
- DC and AC cabling, isolators, surge protection and earthing.
- Access and scaffolding, priced rather than assumed.
- The connection application: who prepares it, who pays any fee, and what happens if a load assessment is required.
- Commissioning, handover documentation and the electrical certificate.
- Warranties listed separately — product, performance, inverter and workmanship — each with a term in years.
- Whether the price is before or after the grant, and who submits the application.
- VAT treatment stated on the face of the quote.
An estimated annual yield is useful, but only alongside the assumptions behind it: orientation, tilt and the shading the installer observed on site. Treat it as an assumption rather than a promise. Our price pages and payback material work the same way — the arithmetic is shown so you can put your own numbers through it.
Warning signs
- No site visit. A quote produced from a satellite image has not seen the water tank, the neighbour's stair enclosure, or the state of the roof membrane.
- A deposit of more than about a third, or a request for cash. Stage payments tied to delivery and commissioning are the norm for a reason.
- The price only quoted "after grant", or as a monthly figure. Both make comparison impossible, which is generally the point.
- Urgency around the grant. Scheme dates are published by the Ministry of Energy, Commerce and Industry. If someone says the scheme closes on Friday, check it rather than signing.
- Silence on the connection application. If it is not in the quote, assume it is not in the price.
- A payback figure offered before anyone has looked at your bills. Payback in Cyprus turns on how much of your generation you consume during daylight. Nobody can tell you that without seeing your consumption.
- Substituted equipment. A change of panel or inverter brand between order and delivery should be a written variation you approve, not a message on the morning of installation.
Common questions
Do I need planning permission for roof panels?
A roof-mounted residential system within the usual size limits generally does not require planning permission, but it does require the application to the Electricity Authority of Cyprus before it can be connected and export-metered. Listed buildings and conservation areas carry additional requirements — check with the Department of Town Planning and Housing.
How long does the grid connection take?
Around 45 days is the typical duration for the connection application in normal conditions. Where local network capacity is constrained a load assessment may be required first, which adds time. Ask your installer to tell you the date the application was submitted, not just that it "has gone in".
Is the cheapest quote per kWp always the problem?
Not always, but it is always worth interrogating. Installed prices sit between €900 and €1,300 per kWp with a median around €1,080. Below that band, find the omission before you assume you have found a deal.
Should I use a company based in my own district?
Not necessarily, though travel time is priced into day rates and shows up most in the far corners, such as Polis Chrysochous. What matters more is whether the company will come back for a fault in year four. Ask what the response arrangement is once the warranty is running, and get it into the contract.
Does the grant restrict who I can use?
It sets conditions on the installation and on timing rather than handing you a shortlist, and applications go in before work starts. Read the current terms on the Ministry's site — the conditions are the part that changes between rounds.
What happens to my warranty if the installer stops trading?
Product and performance warranties sit with the manufacturer and survive the installer. Workmanship warranties do not — they are worth what the issuing entity is worth. That is the practical reason to check how long a company has been on the register before weighing its workmanship promise.
Registered installers by district
8 companies covering this area.
Limassol Electrician 24/7
Potamos Germasogeias, Limassol
Limassol Electrician 24/7 is an electrical contractor in Potamos Germasogeias, in the Limassol district. Recorded services include fault finding, consumer units, rewiring.
- Fault finding
- Consumer units
- Rewiring
- Certification
Vascon Solar Experts LTD
Pera Chorio, Nicosia
Vascon Solar Experts LTD is an energy supplier in Pera Chorio, in the Nicosia district.
Kyriakos Louka & Yioi LTD (Office) is an electrical contractor in the Nicosia district. Recorded services include fault finding, consumer units, rewiring.
- Fault finding
- Consumer units
- Rewiring
- Certification
- 1
Bioenergy
Polis, Paphos
Bioenergy is a company in Polis, in the Paphos district.
- 1
ΦΑΝΟΣ ΚΑΡΑΝΤΩΝΗΣ
Nicosia
ΦΑΝΟΣ ΚΑΡΑΝΤΩΝΗΣ is listed on the Cyprus Energy Service register of certified solar PV installers under registration Γ01/2017, valid to 24/5/2029. The entry covers ΠΑΛΑΙΟΜΕΤΟΧΟ, the nicosia district. Details come from the public register and have not been verified with the business.
- 1
ΧΑΡΑΛΑΜΠΟΣ ΠΑΝΑΡΗΣ
Nicosia
ΧΑΡΑΛΑΜΠΟΣ ΠΑΝΑΡΗΣ is listed on the Cyprus Energy Service register of certified solar PV installers under registration Γ03/2017, valid to 5/8/2029. The entry covers ΑΓΙΟΣ ΔΟΜΕΤΙΟΣ, the nicosia district. Details come from the public register and have not been verified with the business.
- 1
ΝΕΟΦΥΤΟΣ ΤΣΙΓΑΡΙΔΗΣ
Nicosia
ΝΕΟΦΥΤΟΣ ΤΣΙΓΑΡΙΔΗΣ is listed on the Cyprus Energy Service register of certified solar PV installers under registration Γ05/2017, valid to 5/8/2029. The entry covers ΕΡΓΑΤΕΣ, the nicosia district. Details come from the public register and have not been verified with the business.
- 1
ΣΤΕΦΑΝΟΣ ΧΡΙΣΤΟΔΟΥΛΟΥ
Nicosia
ΣΤΕΦΑΝΟΣ ΧΡΙΣΤΟΔΟΥΛΟΥ is listed on the Cyprus Energy Service register of certified solar PV installers under registration Γ06/2017, valid to 1/12/2029. The entry covers ΛΥΘΡΟΔΟΝΤΑΣ, the nicosia district. Details come from the public register and have not been verified with the business.
Sources
- Electricity Authority of Cyprus — connection and metering — retrieved 2026-07-28
- Cyprus Energy Regulatory Authority — net metering framework — retrieved 2026-07-28
- Ministry of Energy, Commerce and Industry — support schemes — retrieved 2026-07-28
- Cyprus Scientific and Technical Chamber (ETEK) — member register — retrieved 2026-07-28
- Department of Town Planning and Housing — retrieved 2026-07-28
01More on this topic
Same cluster.Different question.
7 min readSolar Panel in Nicosia: Costs and Local Companies
Real solar panel ranges for Nicosia, Cyprus, what moves them, and what to check before accepting a quote.
7 min readSolar Panel in Limassol: Costs and Local Companies
What a solar system costs installed in Limassol, how high-rise roofs, salt air and grid capacity move the quote, and what to check before you sign.
7 min readSolar Panel in Larnaca: Costs and Local Companies
Real solar panel ranges for Larnaca, Cyprus, what moves them, and what to check before accepting a quote.
7 min readSolar Panel in Paphos: Costs and Local Companies
What photovoltaic systems cost in Paphos, how the district sits against the national range, and what to check before you accept an installer's quote.
7 min readSolar Panel in Famagusta: Costs and Local Companies
Real solar panel ranges for Famagusta, Cyprus, what moves them, and what to check before accepting a quote.

Thinking of doing this?Get up to five quotes, free.
Send us your roof and your electricity bill and we will gather quotes from installers who work from your numbers.